Part Transfers

    Part Transfers


    Article summary

    Part Transfers occur when Parts are added, changed, stepped, removed, or completed on a Work Order. You can access Parts Transfer Histories from Work Order pages.

    Part Transfer Quantity:

    When you click MOVE PARTS you can enter the quantity manually, so be careful to move all the Parts that need to be moved. Someone could accidentally enter 10 rather than 100 and then 90 might be left behind in the system, requiring them to be moved separately through the process. A good way to avoid these mistakes is to put your Parts on Racks.

    Select Treatment While Transferring:
    • Users are able to select a Treatment while moving Parts if the Treatment selection was left blank.
    • Users are also prompted to add Treatments prior to racking if Treatments are missing.

    Screenshot 2024-11-11 at 10.58.18 AM.png

    Screenshot 2024-11-11 at 10.54.51 AM.png


    Types of Part Transfers

    There are seventeen possible types of Part Transfers.

    • COMPLETE: Work on Parts has been completed. Completing Parts removes them from the production workflow.
    • ENTRANCE: Parts are added, or "entered," into a Work Order.
    • EXIT: Parts are removed from a Work Order without being completed.
    • HOLD_ENTRANCE: Parts are placed on Quality Hold. Parts on Quality Hold cannot be moved again until the hold is removed.
    • HOLD_EXIT: A Quality Hold on Parts is removed.
    • JOIN_INPUT: Parts are being Joined on a Work Order. This is the first step in the two step process of Part Joins.
    • JOIN_OUTPUT: Parts are being joined on a Work Order. This is the second step in the two step process of part joins.
    • RETURN_ENTRANCE: Parts have been returned under a Return Merchandise Authorization. This is the first step in the two step process of completing an RMA.
    • RETURN_EXIT: Parts have been returned under a Return Merchandise Authorization. This is the second step in the two step process of completing an RMA.
    • REWORK: Parts are being moved to a Rework Work Order for Rework.
    • REWORK_DONE: Parts are being returned to their original Work Order after completing Rework.
    • SCRAP: Used for scrapping unneeded Parts. This is just like "EXIT", except it will be tracked.
    • SPLIT_INPUT: Parts are being Split on a Work Order. This is the first step in the two step process of Part Splits.
    • SPLIT_OUTPUT: Parts are being split on a Work Order. This is the second step in the two step process of Part splits.
    • STEP: Parts are stepped from one Recipe Node to the next. This is the most common type of Part Transfer.
    • TRANSFER: Parts are moved from one Recipe Node to another, but not necessarily in order. Transfers are used to manually place Parts at a specific Recipe Node.
    • TRANSFORM_INPUT: A Part is being Transformed into other Parts. This is the first step in the two step process of Part Transformations.
    • TRANSFORM_OUTPUT: A Part is being transformed into other Parts. This is the second step in the two step process of Part transformations.
    About the SCRAP transfer type
    • Ability to track scrapped Parts in Steelhead.
    • Scrap Parts from Move Parts dialog to exit from the WO and track as scrap.
    • Scrap is tracked on the Sales Order, Work Order, and Invoice.
    • Select "Mark as Scrap" when creating a Quality Hold to scrap the Parts if they do not get re-entered into the Work Order.
    • Users will need "Write Parts transfers of type scrap" permissions to scrap from "Move Parts" dialogs, and "Write quality" permissions to scrap from QMS. User Permissions are accessible from the User Page.

    Screenshot 2024-03-13 at 9.24.41 AM.png

    If you have some Parts on a Work Order that need to be scrapped you can select 'Move parts' and mark the transfer type as "SCRAP". SCRAP works about the same as EXIT except that Scrap is tracked for follow up. If you only to scrap 2 out of the 4 Parts on the Work Order, you can change the part count to 2.
    image.png

    This will remove two Parts off the Work Order.
    If you need to still invoice for the two Parts that are scrapped, you can still have the quantity as four, it will just show two scrapped Parts (as seen in red).
    image.png

    If you did not want to charge for all the Parts the same, you could add a Sales Order Line prior to Invoicing for what you need to charge. In this example, a Sales Order Line for "Strip Fee" will show on the Invoice that is to be finalized:
    image.png

    For more info, see this video about scrapping.


    Work Order Parts Transfer Histories

    The Work Order Parts Transfer History page provides information on all Parts transfers that occurred for a specific Work Order. This is useful for tracking who moved Parts, when, and where.

    The search bar located at the top of the Part Transfers page is a great way to find a particular transfer for a certain Part Number if there are multiple on one Work Order. (Or if you are looking for transfers to a particular Node or Station!) You may also double your search efforts by adding an additional search bar so you can search by Part Number and by Node to be more granular in your filtering.
    Screenshot 2025-04-23 at 4.16.44 PM.png

    Part transfer information is collected when Parts on a Work Order are added, changed, stepped, removed, or completed. Most commonly, Parts are added during order entry and then stepped from one Recipe Node to the next. The most common part move occurs when operators step Parts on Workboards or when Parts are moved through the Shipping or Invoicing dashboards.

    pthist.gif

    Measurement History

    You can view measurement history on Part Transfer Accounts on the Part Transfers page.

    Screenshot 2024-05-16 at 9.23.30 AM.png

    Comments on Part Transfers

    When you add comments, they will appear on the Part Transfer. You can access this from the Part Transfer history on the Work Order screen, and then clicking on the specific transfer from that table. They can also be pulled into reports if necessary:
    screenshot 5-1.jpg

    screenshot 6.jpg

    Editing Recipe after Transferring:

    When editing Work Order Recipe Trees, changes cannot be made to any steps the Parts have already moved through.

    • If Parts have already been moved through the Node for "welding", changes cannot be made to the tree before this step.
    • To make any changes before this step, all Parts transfers will have to be deleted, back to where you would like to add additional Nodes. (Note: if there is billed time against a Part Transfer, you will need to delete that billed time: this is located right above the View All Part Transfers Link on the WO page called View All Billed Hours.)
    • Then you can go in and add any missing steps.

    Step Parts with Spec Params:

    In this example, "Chrome Pre Measurement Fit 1", the Spec Field Params show that an input is required in order to move to the next step in a Process.

    • Therefore operators need to enter those Spec measurements before they can step the Parts.
    • You can change that in the Spec Field if you do not need/want a measurement to be required.
    • The operators will then be able to step the Parts without entering in a measurement.
      image.png

    Was this article helpful?