Tags

    Tags


    Article summary

    Tags

    Tags can be added to a Process Node and give you the ability to reference Process Nodes from other places within Steelhead.

    Multiple Process Nodes can share the same tag. If a Process Node has a tag assigned to it, you can add that same Process Node to other Process Trees, creating a Shared Node.

    For Scheduling and Prioritizing, this tag is used to specify limits in which to look for parts. If parts are outside of the limit of the specified tag they get filtered out.

    Editing Tags:

    There is no way to edit a tag. If you do need to change a tag, the best option would be to add a new tag to a process node and delete the tag you no longer need.


    Was this article helpful?