Contract Review

    Contract Review


    Article summary

    Set Up

    Once Contract Review is set up, you will have full visibility of the steps of the parts on a Work Order prior to sending them further in the process.
    Screenshot 2024-07-02 at 2.20.07 PM.png

    Contract Review Node

    Make sure that a Contract Review node type is present in the process chosen for the work order, or add it to the Work Order recipe. You may have multiple Contract Review nodes in a process.

    Screenshot 2024-06-24 at 2.57.42 PM.png

    Contract Review Sign Offs

    Contract Review sign offs will allow specific users to pass/fail the next nodes of the parts in the process. A failing node will prevent the parts from moving on. All nodes following a Contract Review node must be passed in order for the parts to move on.

    Screenshot 2024-06-24 at 3.06.38 PM.png

    To set up sign offs:

    1. ​Go to Processes.​
    2. Select or create the node you would like to require a sign off.
    3. Assign Contract Review User(s)​.

    Jul-02-2024 15-26-00.gif

    "Traffic Light" Color-Coded Sign-offs:

    Color-coded statuses will be shown on the ‘Contract Sign Offs’ box:

    • If all Contract Reviews are signed, but one or more are failing, the box will turn light red
    • If all Contract Reviews are signed and passing, the box will turn light green
    • If any Contract Review is not signed off, the box will be light yellow

    image.png

    Contract Review on Workboards

    Once the Contract Review node is set up, you are then able to make a Workboard card for that process node. Parts displayed on this card will allow you to reach Contract Review. Do so by opening Work Parts or the Contract Review icon in the top left corner.

    Feb-23-2024 10-52-25.gif

    Contract Review Locations in Steelhead

    Contract Reviews can be accessed from:

    • Contract Review tile
      Screenshot 2024-07-02 at 1.52.54 PM.png
    • Workboards
      Screenshot 2024-07-02 at 1.52.17 PM.png

    Operating Contract Review

    There are multiple actions you can take once inside of a Contract Review:

    Top Bar and Recipe Tree Sidebar

    The top of the Contract Review page includes:

    • Part Number details
    • Work Order details

    The specific node that is highlighted can be paged up and down by selecting which one is preferred, or by pressing CMD+ Arrow keys on a computer.

    Edit Part Number/Work Order Details:

    To add "Part Number on Work Order Details" to pre-existing Work Orders, first navigate to the corresponding Sales Order. Then, select the edit pencil button on the Work Order line.
    image.png

    This table will pop up, select the "EDIT" icon on the "Part Number On Work Order Details" line.
    image.png

    Then, fill in the information and select save
    image.png

    This information will display on the "Part Number on Work Order Details" sections of a Work Order.
    image.png

    Part Number & Current Node Windows

    The Part Number window includes multiple pieces of information regarding the part number. This may include units, measurements, descriptions, rack information, files, etc.

    The Current Node window includes information and instructions for the selected node.

    There is also the option to view sales order files in contract review

    Screenshot 2023-11-13 at 3.51.35 PM.png

    Work Order Comments

    Work Order Comments will appear here, if there are any. While in Contract Review, you are able to add additional Work Order comments if necessary.

    Connection to Invoicing:
    • Work order comments and files can be shown on the invoicing page
      • Add work order comments and files to a work order
      • Invoice for the work order
      • An accordion-menu should appear and display this information

    All Applied Specs

    This section is displayed on Contract Review nodes and will show the specifications that are applied to the part number. The names of applied specs are hyperlinked so the page showing their details can be visited easily. These specs can be edited through the "Edit Specs" button.

    Spec Measurements
    • Spec measurements cannot be recorded inside of Contract Review unless the parts are currently at the node
    • To make a new spec measurement, follow these steps:
      • Go to the relevant Work Order
      • Open Spec Results
      • Select the desired part, part group, and spec
      • Click the red button that says "Collect Additional" and fill out all measurement details
      • If desired, you can archive and unarchive measurements here as well

    Edit Specs

    Clicking the "Edit Specs" button brings you to a spec menu screen that lets you perform multiple actions:​

    • View, add, and archive specs​
    • View, add, archive, and edit spec field params​
    • ​Create location-based spec field params
    • View archived specs
    • Collapse and expand specs and spec fields

    Any edits made here will affect only the Part Number on the Work Order.

    Archive/Edit Specs:

    To edit specs on the Work Order, you can go in and edit by clicking the button below:
    Screenshot 2024-10-01 at 2.54.56 PM.png

    Once you are editing specs, to make it a little clearer to what is all listed in here, you can select to hide spec and it will only show the name.
    image.png

    And then whichever spec you are not wanting, you can choose to archive, or if it's a particular parameter in a Spec Field, that can also be archived.
    Screenshot 2024-10-01 at 2.56.38 PM.png

    Another Method:

    In order to archive the spec, you will need to archive all the measurements that were taken on that WO for the spec. Once they are all archived you can archive the spec. If you go under the spec results under the work order, this window will populate and you can archive the measurements.
    Screenshot 2024-10-22 at 2.40.24 PM.png

    It may be easier to edit the param for the WO and enter in the tolerance and target value there, please see screenshots below on how you can edit the param and enter in a target value and tolerance.

    • If you go to edit specs from the WO, you can select the edit pencil button boxed off in the screenshot below
    • You would then enter a target value and then a tolerance of 0 here and get rid of the min and max
    • This way you will not need to retake the measurements that were already taken on the WO
      image.png

    image.png

    View Archived Specs:

    To view archived specs, if you click the 'View Archived Specs' in the top right corner, that will bring up a list of all the archived specs.
    image.png

    You can tell that you are viewing archived specs because once you click to view archived, the top right corner will now say 'view specs'
    Screenshot 2024-10-01 at 3.45.33 PM.png

    Process Node Power Instructions

    This section displays dynamic instructions for the highlighted Process Node. In the menu opened by the button labeled "Edit Power Tools" is an editing terminal that can be useful for altering how each station will process the parts treated at it. This menu is intended for TypeScript-trained users.

    Edit Work Order Recipe

    Clicking the "Edit Work Order Recipe" button brings you to a recipe menu screen that will let you edit the Work Order recipe. Within Contract Review, this button is found only on Contract Review nodes.

    Screenshot 2024-07-03 at 8.50.27 AM.png


    Was this article helpful?