Contract Review

    Contract Review


    Article summary

    Set Up

    Once Contract Review is set up, you will have full visibility of the steps of the parts on a Work Order prior to sending them further in the process.
    Screenshot 2024-07-02 at 2.20.07 PM.png

    Contract Review Node

    Make sure that a Contract Review node type is present in the process chosen for the work order, or add it to the Work Order recipe. You may have multiple Contract Review nodes in a process.

    Screenshot 2024-06-24 at 2.57.42 PM.png

    Contract Review Sign Offs

    Contract Review sign offs will allow specific users to pass/fail the next nodes of the parts in the process. A failing node will prevent the parts from moving on. All nodes following a Contract Review node must be passing in order for the parts to move on.

    Screenshot 2024-06-24 at 3.06.38 PM.png

    To set up sign offs:

    • ​Go to Processes​
    • Select or create the node you would like to require a sign off
    • Assign Contract Review User(s)​

    Jul-02-2024 15-26-00.gif

    Contract Review on Workboards

    Once the Contract Review node is set up, you are then able to make a Workboard card for that process node. Parts displayed on this card will allow you to reach Contract Review. Do so by opening Work Parts or the Contract Review icon in the top left corner.

    Feb-23-2024 10-52-25.gif

    Contract Review Locations in Steelhead

    Contract Reviews can be accessed from:

    • Contract Review tile
      Screenshot 2024-07-02 at 1.52.54 PM.png
    • Workboards
      Screenshot 2024-07-02 at 1.52.17 PM.png

    Operating Contract Review

    There are multiple actions you can take once inside of a Contract Review:

    Top Bar and Recipe Tree Sidebar

    The top of the Contract Review page includes:

    • Part Number details
    • Work Order details

    The specific node that is highlighted can be paged up and down by selecting which one is preferred, or by pressing CMD+ Arrow keys on a computer.

    Part Number & Current Node Windows

    The Part Number window includes multiple pieces of information regarding the part number. This may include units, measurements, descriptions, rack information, files, etc.

    The Current Node window includes information and instructions for the selected node.

    Screenshot 2023-11-13 at 3.51.35 PM.png

    Work Order Comments

    Work Order Comments will appear here, if there are any. While in Contract Review, you are able to add additional Work Order comments if necessary.

    Connection to Invoicing:
    • Work order comments and files can be shown on the invoicing page
      • Add work order comments and files to a work order
      • Invoice for the work order
      • An accordion-menu should appear and display this information

    All Applied Specs

    This section is displayed on Contract Review nodes and will show the specifications that are applied to the part number. The names of applied specs are hyperlinked so the page showing their details can be visited easily. These specs can be edited through the "Edit Specs" button.

    Spec Measurements
    • Spec measurements cannot be recorded inside of Contract Review unless the parts are currently at the node
    • To make a new spec measurement, follow these steps:
      • Go to the relevant Work Order
      • Open Spec Results
      • Select the desired part, part group, and spec
      • Click the red button that says "Collect Additional" and fill out all measurement details
      • If desired, you can archive and unarchive measurements here as well

    Edit Specs

    Clicking the "Edit Specs" button brings you to a spec menu screen that lets you perform multiple actions:​

    • View, add, and archive specs​
    • View, add, archive, and edit spec field params​
    • ​Create location-based spec field params
    • View archived specs
    • Collapse and expand specs and spec fields

    Any edits made here will affect only the Part Number on the Work Order.

    Process Node Power Instructions

    This section displays dynamic instructions for the highlighted Process Node. In the menu opened by the button labeled "Edit Power Tools" is an editing terminal that can be useful for altering how each station will process the parts treated at it. This menu is intended for TypeScript-trained users.

    Edit Work Order Recipe

    Clicking the "Edit Work Order Recipe" button brings you to a recipe menu screen that will let you edit the Work Order recipe. Within Contract Review, this button is found only on Contract Review nodes.

    Screenshot 2024-07-03 at 8.50.27 AM.png


    Was this article helpful?